Structural
Marina Mall
Structural Modification Works including Void Filling at Marina Mall, Abu Dhabi
Client
M/s National Investment Corporation (PISC)
Consultant
M/s WME Engineering Consultant
Value
AED 5,250,000
Location
Marina Mall, Abu Dhabi
Challenge
Proposed Structural Modification Works including Void Filling at FM 9, 10 and 11, upgrading of Marina Mall, Abu Dhabi.
Solution
TCR has been appointed by Client to address the above requirements. Voids were closed with the combination of steel beams, micro-concrete and normal concrete. The nearby structural elements (slabs, columns and beams) were strengthened by section enlargement and CFRP to bear the additional loads. It was a design and build project carried out under the supervision of consultants.